MITS6500 Assessments

MITS6500 Capstone Project
Assessment Document
Please Read Carefully
MITS6500 Assessments
Copyright © 2015-2018 VIT, All Rights Reserved. 2
Important Note:
This Unit does not have a Final Exam but is based on your semester work and a final presentation/
demonstration of your working prototype to be arranged at the end of the semester. Students will
work in groups to build a working prototype of a small to medium system. The system will initially
be described by a small project description, and the groups will need determine the requirements
by discussion with a project sponsor, and by studying the descriptions of other similar systems
using search tools. Because of the nature of the subject there will be a number of check points
throughout the semester, and each one of these will form a deliverable related to the project and
contribute towards your final grade. The deliverables (assignments) are outlined in Table 1 below.
While this may seem a lot, please remember there is no exam, and this is a double unit. Thus, you
are allocated 6 hours of designated time per week. Since you should also be putting in
approximately 2 or more hours for each hour of designated class time, this would constitute
approximately 18 hours work per week. So a group 4 students should be able to put in about 72
hours a week of effort. The assessments are designed to keep you working consistently throughout
the semester and this is necessary given the nature of the Unit of Study.
The overall marks are to be allocated as follows (as per the Unit Descriptor)

Assessment Component Weighting Hurdle
Project Reports and Prototype 80% Yes
Presentation 20% Yes

The breakdown of the above components into deliverables and weeks are given in Table 1:
Table 1 Unit of Study Deliverables

Component Deliverable Deliverable
Weight
Week
Documentation and Prototype
Proposal Full Project Proposal 10 3
Plan Project Plan 10 5
Specification Specification and Design document 15 7
Prototype Design Design of the initial Prototype 10 8
Status Report 5 8
Status Report 5 10
Test Plan Test Plan Documentation 10 11
Status Report 5 12
Source Code Submission of source code and instructions 10 13
Presentation Presentation and Demonstration of Prototype 20 14

MITS6500 Assessments
Copyright © 2015-2018 VIT, All Rights Reserved. 3
INSTRUCTIONS
As this is the final capstone subject for the master’s qualification, students will be required to work
in project groups and draw on the skills and knowledge acquired throughout their studies in the
other foundation, core and elective subjects. Each group will be required to choose from a number
of projects, each offering a similar level of complexity. Each project will be described by a short
informational paragraph, and the project groups will be required to determine the requirements
from the information given and by questioning the project sponsor. Students will be given access
to the sponsor as needed. The projects groups are required to meet once per week throughout the
semester and discuss their progress with their project sponsor/ or supervisor. Frequent nonattendance at these meetings may affect an individual’s grade. It is envisaged that each member of
the group will receive the same grade, unless an individual’s grade is affected by other
circumstances. As part of the capstone project experience, the groups are expected to self-manage
and devise their own solution to their particular problem, including determining the database
requirements, the language and platform to be used, and to overcome technical difficulties
encountered. During the weekly meetings, the groups are encouraged to discuss any difficulties
with their supervisor, and while the supervisor will not solve the problems for the group, they will
offer advice. Brief records of the meetings will be kept.
Deliverables
Below is a brief explanation of each of the deliverables including submission guidelines and
deadlines, though the deadlines have already been given in the Table 1 above.
Proposal ( 10 Marks Due session 3)
The first submission represents the project proposal. This would be the proposal put forward for
approval by an evaluation committee or IT Manager before a proposed software project could
proceed to the next level. You should be drawing on your project management experience to put
together this proposal. A Proposal Template will be provided with suggested sections to be
included. However, you are free to add other sections to enhance your project proposal. You can
also delete some of the included template sections, but you should think carefully before deciding
to do this and have valid reasons for doing so.
The format of the project proposal can be found in the example document (Project Proposal
template.doc). Use this document as a starting point to develop your plan and submit by the due
date and time to the assignment drop-box.
Project Plan ( 10 Marks Due session 5)
MITS6500 Assessments
Copyright © 2015-2018 VIT, All Rights Reserved. 4
The project plan also draws on your IT Project Management skills to develop the Project Plan that
follows on from a successful Proposal. You should refer to your notes and subject material from
the Core IT Project Management subject you would have studied. Again, a Project Plan template
will be provided with suggested sections to be included. However, you are free to add other
sections to enhance your project plan. You can also delete some of the included template sections,
but you should think carefully before deciding to do this and have valid reasons for doing so. The
project plan will highlight your groups ability to develop guidelines by which you can manage the
conduct of the project throughout the semester.
The format of the project plan can be found in the example document (Project Plan template.doc).
Use this document as a starting point to develop your plan and submit by the due date and time to
the assignment drop-box.
Specification and Design Document ( 15 Marks Due session 7)
The Specification and design documentation will require your knowledge from Software
Engineering, the core unit you would have studied in your first or second semester. Your group
will need to produce the documentation required in order to prepare for the implementation of the
project. The specification documentation will make sure you understand the requirements, and the
design documentation will lay-out the plan for building the project. The types of things needed to
be included here will be similar to the major assignment in Software Engineering. Additionally,
students should analyze any security needs of project and using techniques learned from IT
Security, incorporate these into the design for later implementation. A Specification and Design
Plan template will be provided with suggested sections to be included. However, as with the
previous templates, you are free to add other sections to enhance your documentation. You can
also delete some of the included template sections, but you should think carefully before deciding
to do this and have valid reasons for doing so.
This documentation is to prepare the group for the implementation phase of the project, and to
reinforce the need for following a well-defined System Development Life-Cycle model.
Submit by the due date and time to the appropriate assignment drop-box.
Project Implementation.
The remainder of the project is the implementation phase of what you have previously planned
and designed. To aid you in your implementation there are a number of deliverable milestones,
including status reports at various points to help you and your supervisor in reflecting on what has
been achieved to date and what is yet to be achieved. The group should be monitoring their
MITS6500 Assessments
Copyright © 2015-2018 VIT, All Rights Reserved. 5
progress and be taking steps to ensure they are on track by utilizing project management skills
learned in previous units. During the implementation, the students should be coding to a high
standard, utilizing skills developed in previous units. You need to implement the security model
you have designed in the specification and design phase, and test this against business needs and
concerns. You should utilize the knowledge and skills from IT Security. If there is a mobile app
component of the project, you should utilize the latest tools and techniques to implement this part
of the project.
Prototype Design ( 10 Marks Due session 8)
The purpose of the prototype Design submission is to assist you in developing the prototype by
thinking about how requirements and assumptions are combined into tasks to be implemented.
This can be done by creating task flows, dependency diagrams and Task Layer maps. Please
consult Chapter 4 of the book, “Effective Prototyping for Software Makers” by Arnowitz, J.,
Arent, A., and Berger, N. Pages 50-61
This is meant to be a 1-2 page submission showing a brief prototype, to solidify your groups ideas
for the design of the prototype into something a little more concrete for implementation.
Submit this chapter by the due date and time to the assignment drop-box.
Status Reports ( 5 x 3 Marks Due sessions 8, 10, 12)
There are three status reports due throughout the project. These are in sessions 8, 10 and 12. The
purpose of the status reports is help your supervisor keep track of the progress being made, and for
the group to reflect on its own progress, difficulties being encountered and the deliverables
completed and begun since the last submission. A Status report template is provided and each
group is to complete the report as a group collaboration and submit by the due date and time.
Submit your status reports to the appropriate drop-box by the indicated date and times is the
sessions outlined above.
Test Plan ( 10 Marks Due session 11)
To Be Provided
Submit this document by the due date and time to the assignment drop-box.
Source Code ( 20 Marks Due session 13)
MITS6500 Assessments
Copyright © 2015-2018 VIT, All Rights Reserved. 6
Submit all documentation by the due date and time to the assignment drop-box.
Presentation ( 20 Marks To be arranged – typically in the equivalent of session 14)
For this component you will be required to give a 15 – 20 minute presentation and demonstration
on the functionality of your prototype, as well as answer any questions from the audience. The
presentations will be conducted in a symposium type setting after the end of the semester, typically
in week 14. There is no submission for this component of assessment, you will be graded on your
presentation, demonstration of technical skills and ability to answer any questions put to you. As
well as all students in the class, there will be a panel of three academic staff members grading the
presentation and demonstration. During the demonstration, its possible you might be asked to
further demonstrate certain functionality of your prototype by adding records, performing tasks
and observing the results on the newly added data, or even show the code behind the functionality.
You should make sure you have a suitable amount of test data loaded, and that you have tested
your prototype according to the test plan you submitted in session 11.
As this component is based on your presentation, you will need to present in order to be allocated
any grade for this component. Students not attending will not be given a grade even if their group
demonstrates in their absence.
Submission guidelines
All submissions except Status Reports and the Source Code submission are to be submitted
through turn-it-in. Drop-boxes linked to turn-it-in will be set up in the Unit of Study Moodle site.
Assignments not submitted through these drop-boxes will not be considered.
Submissions must be made by the due date and time (which will be in the session detailed above)
and determined by your Unit coordinator. Submissions made after the due date and time will be
penalized at the rate of 10% per day (including weekend days).
There will be a zero tolerance for plagiarism and the turn-it-in similarity score will be used in
determining the level if any of plagiarism. Turn-it-in will check conference web-sites, Journal
articles, the Web and your own class member submissions for plagiarism. You can see your turnit-in similarity score when you submit your assignment to the appropriate drop-box. If this is a
concern you will have a chance to change your assignment and re-submit. However, re-submission
is only allowed prior to the submission due date and time. After the due date and time have
elapsed you cannot make re-submissions and you will have to live with the similarity score as there
MITS6500 Assessments
Copyright © 2015-2018 VIT, All Rights Reserved. 7
will be no chance for changing. Thus, plan early and submit early to take advantage of this feature.
You can make multiple submissions, but please remember we only see the last submission, and
the date and time you submitted will be taken from that submission.

YOU MAY ALSO READ ...  University of California Childhood Obesity as A Public Health Problem Discussion

WE OFFER THE BEST CUSTOM PAPER WRITING SERVICES. WE HAVE DONE THIS QUESTION BEFORE, WE CAN ALSO DO IT FOR YOU.

Assignment status: Already Solved By Our Experts

(USA, AUS, UK & CA PhD. Writers)

CLICK HERE TO GET A PROFESSIONAL WRITER TO WORK ON THIS PAPER AND OTHER SIMILAR PAPERS, GET A NON PLAGIARIZED PAPER FROM OUR EXPERTS

Order from Academic Writers Bay
Best Custom Essay Writing Services

QUALITY: 100% ORIGINAL PAPER NO PLAGIARISM - CUSTOM PAPER

Why Choose Us?

  • 100% non-plagiarized Papers
  • 24/7 /365 Service Available
  • Affordable Prices
  • Any Paper, Urgency, and Subject
  • Will complete your papers in 6 hours
  • On-time Delivery
  • Money-back and Privacy guarantees
  • Unlimited Amendments upon request
  • Satisfaction guarantee

How It Works

  • Click on the “Place Your Order” tab at the top menu or “Order Now” icon at the bottom and a new page will appear with an order form to be filled.
  • Fill in your paper’s requirements in the "PAPER DETAILS" section.
  • Fill in your paper’s academic level, deadline, and the required number of pages from the drop-down menus.
  • Click “CREATE ACCOUNT & SIGN IN” to enter your registration details and get an account with us for record-keeping and then, click on “PROCEED TO CHECKOUT” at the bottom of the page.
  • From there, the payment sections will show, follow the guided payment process and your order will be available for our writing team to work on it.

About AcademicWritersBay.com

AcademicWritersBay.com is an easy-to-use and reliable service that is ready to assist you with your papers 24/7/ 365days a year. 99% of our customers are happy with their papers. Our team is efficient and will always tackle your essay needs comprehensively assuring you of excellent results. Feel free to ask them anything concerning your essay demands or Order.

AcademicWritersBay.com is a private company that offers academic support and assistance to students at all levels. Our mission is to provide proficient and high quality academic services to our highly esteemed clients. AcademicWritersBay.com is equipped with competent and proficient writers to tackle all types of your academic needs, and provide you with excellent results. Most of our writers are holders of master's degrees or PhDs, which is an surety of excellent results to our clients. We provide assistance to students all over the world.
We provide high quality term papers, research papers, essays, proposals, theses and many others. At AcademicWritersBay.com, you can be sure of excellent grades in your assignments and final exams.

NO PLAGIARISM